Description
Siam Design – Buy House Plans
SD226
HOUSE CATALOG
Explore the ultimate tropical living with 3 Bedroom House by Siam Design.
Breath in fresh air and enjoy total relaxation in the modern style living. combining open plan for kitchen and living room, 3 wide bedroom with endless opening to the beautiful surroundings. Get house plans and permit yours now, it’s fast and easy with Siam Design.
About Property:
3D Model 360 View
SD226
Property Specifications:
PROPERTY SIZE
320 SQM
BEDROOMS
3
TIME TO BUILD
8-10 MONTHS
BATHROOMS
3
COST TO BUILD ESTIMATE
Under 10 million THB
Siam Design House Plans – 3 Bedroom Villa
(SD226)
Architectural House Plans Ready to Build
STEP 1: PLAN
9,900 THB
Including:
1. House 3D and 2D model digital files – SKP and DWG (Sketchup and AutoCAD).
2. PDF Architectural Plans, including plans: Floor, Roof, Section, Elevation (8-10 Pages)
3. Full House Render Set – 8 Images and 1 Minute Video
STEP 2 : PERMIT
360 THB / PER 1 SQM
Including:
1. Fit the House Plan to your land location
2. Full house book – (40-50 pages PDF) Including: Architectural, Structure, Sanitary, Electric and Site Plan.
3. Apply Building Permit
Popular Questions & Answers:
1. What is the House Plans Catalog ?
Architectural house drawings ready to build.
all plans following Thai building regulations -Koh Phangan, Koh Samui, Koh Tao.
2. Can I see any Examples?
Free downloads and examples available at Siam Design- House example or Siam Design – Permit .
3. What services House Plans include?
On every purchase receive House digital files, contact Siam Design team to proceed with building permit apply.
4. Tell me more about the process:
Process includes 2 steps Plan and Permit.
Step 1- PLAN includes house plan digital files,
Step 2 -Permit includes construction house plans and house permit.
5. Do I need a building permit and how long does it take?
Customers who intend to build a house are required to obtain a Building Permit certified
according to Thailand building regulations and zoning law.
Once all documents are submitted, it usually takes 4 weeks to receive a building permit.
6. Which documents do I need to show in order to receive a building permit?
– Land title – Chanot or Nor Sor 3.
– DBD (company information).
– ID / PASSPORT copy of land owner.
7. When can I start to build my house?
Once building permit is approved.
8. Can I make modifications to the plan?
Materials changes, fit the plan to your land or mirror the plan is available at additional cost.
Contact Siam Design tea, n order to apply modifications ti your house plan.
9. How can I contact Siam Design?
contact us directly at: [email protected]
10. Which Payment Methods are Available?
Secure Checkout By Credit Cards – PayPal – International and Local Bank Transfer.
Still have question? Contact Siam Design